1/15/12

CycleCar: Mid January progress, 2012


Trailer hub, honda rotor and 5.5" adapter
I"ve got a few more jobs finished.  New tires are mounted.  Accord rotors have been mated to 1200 lb. trailer hubs.  5x5.5 adapters bolted on.  The rear wheel bearings felt a little rough, so I ordered new ones and got the final drive back to smooth operation.  I got the first of the swing arm mounts done and got to see the chassis being held up by the rear tire.  I picked up the front end and walked it around like a 10 foot wheel barrow.
Rear bulkhead done




Bad bearings
Cleaner final drive


Front wheel, 19" model A
CX500 swing arm attached

No comments: